News Flash

ELHS School Building Committee

Posted on: August 29, 2022

ELHS School Building Committee Votes on Designs

The East Longmeadow High School Building Committee voted on Thursday to move forward 4 designs. These designs were:

  • Option 1: Code Upgrade Only
  • Option 2B: Renovation/Addition, with renovation of existing 4 lane pool
  • Option 3B: New Construction with separate new 6 lane pool project
  • Option 5: New Construction with separate building for Central Office, ELCAT, IT, and new 6 lane pool

Below are links to the media for the meeting.

Meeting Video: https://www.youtube.com/watch?v=tx3dvwBxWXg
Meeting Presentation: https://www.eastlongmeadowma.gov/DocumentCenter/View/13364/2022-08-25-SBC-Meeting---PDP-Vote-FINAL
Summary of community survey: https://www.eastlongmeadowma.gov/DocumentCenter/View/13363/Summary-of-Community-Survey---East-Longmeadow-HS
Cheat Sheet for design options: https://www.eastlongmeadowma.gov/DocumentCenter/View/13362/2022-8-25-Summary-of-Options_ELHS-PDP

Facebook Twitter Email

Other News in ELHS School Building Committee